From:                              route@monster.com

Sent:                               Tuesday, April 12, 2016 11:31 AM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: GIS Drafter

 

This resume has been forwarded to you at the request of Monster User xapeix03

William Moses 

Last updated:  03/16/16

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Richmond, TX  77407

Mobile: 8327901617   
williammoses@live.com
Contact Preference:  Mobile Phone

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: William Moses Resume BS

Resume Value: nt4y4x5axu3mp6zn   

  

 

 

 

WILLIAM J. MOSES

williammoses@live.com

Cell   832-790-1617

 

QUALIFICATIONS SUMMARY

 

A highly skilled Industrial Technologist who has been in the profession for over 13 years who had the pleasure of working on various municipal, TXDOT and residential projects that required critical thinking, team lead and team building skills. My positions have enabled me to share my expertise the fields such pipeline, raster imaging,civil, electrical, telecommunication, site development and architectural fields.  I have enhanced my skill set by interpreting various design plans, P&IDs, creating alignment sheets, interpreting topographical surveys, traffic signaling, reading metes &bounds documents, modifying as-built drawings, interpreting row maps, blueprints, field notes, as-built drawings, 3D CAD tools, utilizing GIS applications to create data maps, and creating city planning plats. I have supervised and mentored lower level design designers.

 

APPLICATIONS / SOFTWARE CREDENTIALS

 

Operating Systems: Windows XP and Vista

Design Software:  AutoCAD 2008, 2009, 2010, 2011, 2012, 2013, AutoCAD Civil 3D, MicroStation V8, SolidWorks 2013, Microsoft Office, ArcMap, ArcGIS 10.0, GEOPAK, Primavera, NetZoom SharePoint, PowerPoint, ProjectWise, Meridian, Visio 2007, Google Earth, and Excel

 

EDUCATION

B.S. Industrial Technology, Texas Southern University                                                 05/2000

 

PROFESSIONAL EXPERIENCE

 

 

KLOTZ ASSOCIATES                                                                                               10/2014-PRESENT

CivilSite Designer

 

Key Projects:

·   MAC BUILDING

·   PCCA

·   TDCJ

·   PARK TEN CENTRAL WATER PLANT

 

Responsibilities:

 

·   Performed field visit to investigate current conditions of  the site

·   Utilized Google Map to identify potential conflicts of proposed developments

·   Utilized AutoCadCivil 3d to create DTM’s,alignments, and proposed/existing ditches

·   Created Plan and Profiles of various existing and proposed utilities in the ground.

·   Submited drawings to locate authorities for permitng and review.

·   Interpreted and Modified existing pump station buldings

·   Utiilized various pipeline attributes to create/modify existing pump station buildings and sections

·   Designed TCP’s,horizontal control sheets, parking lots and demolition plans

 

 

 

 

 

 

 

 

 

 

 

 

 

TAS ENERGY                                                                                                                          12/2013-9/2014

Electrical Drafter (contractor)

 

Key Projects:

·   Dominion Brunswick

·   Alaskier Geothread Power Plant

·   Australia Pacific LNG Project

 

Responsibilities:

 

·   Checked AutoCAD drawing aesthetics

·   Performed site visits for manufacturing of parts such as skids, motor pumps, cabinets

·   Observed the installation process of motor pumps, compressor stations, cabinets, control modules, and panduits

·   Modified and created Bills of Materials for proposed projects

·   Interpreted and Modified As-Built drawings for cabinets and wiring diagrams

·   Interpreted/Modified existing P&ID and loop diagrams

·   Exposed to SolidWorks 2013

 

 

CENTERPOINT ENERGY-HARRISBURG SERVICE CENTER                                                     1/2013-10/2013                                                                                  

Electrical Drafter/Structural Drafter (contractor)

 

Key Projects:

·   MD Anderson Cancer Center

·   Astoria Condominiums

·   Saint Luke Episcopal Hospital

·   BP Oil Petroleum

 

 

Responsibilities:

·   Modified/ Designed structural elevations views of electrical vault rooms

·   Designed framing channels for major underground vault rooms

·   Modified job specific standard  details for electrical vault rooms

·   Utilized AutoCAD  Civil 3D to view and edit existing .DWG files

·   Performed basic redline markups of  single line, cable trays, ladders and three line diagrams

·   Utilized ProjectWwise database to store all .DGN and .DWG files.

·   Utilized MicroStation and AutoCAD to generate electrical and structural drawings

·   Interpreted as-built drawings to create electrical site layout sheets

·   Utilized AutoCAD Civil 3D to modify/ to show  existing utilities in ground

·   Utilized AutoCAD and MicroStation to generate lighting layout and ceiling layout sheets

·   Reviewed fabrication and vendor drawings for its proposed application to the project

·   Assisted design engineer of the designing of the proposed projects

 

 

 

BINKLEY & BARFIELD                                                                                                  2011-2013

Telecommunication Design Designer

Key Projects:

·   Grant Substation                     

·   Pearland Parkway

TAS ENERGY                                                                                                                          12/2013-9/20/14

Electrical Drafter (contractor)

 

Key Projects:

·   Dominion Brunswick

·   Alaskier Geothread Power Plant

·   Australia Pacific LNG Project

 

Responsibilities:

 

·   Checked AutoCAD drawing aesthetics

·   Performed site visits for manufacturing of parts such as skids, motor pumps, cabinets

·   Observed the installation process of motor pumps, compressor stations, cabinets, control modules, and panduits

·   Modified and created Bills of Materials for proposed projects

·   Interpreted and Modified As-Built drawings for cabinets and wiring diagrams

·   Interpreted/Modified existing P&ID and loop diagrams

·   Exposed to SolidWorks 2013

 

 

CENTERPOINT ENERGY-1111 lOUSISANA                                                                                            2010-2011

Site Documentation/Telecommunication Design Designer (contractor)

 

Responsibilities:

·   Utilized ArcMap/GIS 10.0 to extract aerial geography of proposed and existing sites

·   Utilized AutoCAD and MicroStation V8 to develop property layout sheets and detail sheets of fiber routes.

·   Performed field visits and collected data to assisted in designing telecommunication fiber shelters

·   Utilized Visio to generate schematic diagrams of telecommunication networks

·   Utilized ArcMap/GIS 10.0 to generate aerial maps for presentations

·   Utilized ArcMap/GIS 10.0 to locate existing fiber lines in various areas of Houston

·   Utilized ArcMap/GIS 10.0 to identify potential fiber conflicts with proposed construction

·   Utilized Team leader skills to train entry level designer

·   Utilized AutoCAD 3D to generate .DWG proposals

·   Utilized MicroStation to show detailed information of  monopoles and transmission towers

·   Assisted the project manager in maintaining the progression and production of site development projects using Microsoft products.

 

JONES & CARTER                                                                                                                  2008-2010

Transportation Civil CAD Designer                           

Key Projects:

·                       University Corridor-Metro Light Rail

·                       Cane Island Parkway Frontage Road for Interstate 10 Highway

 

Responsibilities:

·   Utilized Arc Map/GIS 10.0 to develop street modification plan & profiles sheets,

·   Utilized AutoCAD 3D and MicroStation V8 to developed stormwater pollution prevention plans,

cross sections

·   Utilized MicroStation V8 to design storm, water, and sanitary drainage systems

·   Analyzed as built drawings for developing the project

·   Analyzed and  collected topographic survey maps to design proposed road way projects

·   Created alignment sheets for various utilities such as gas pipeline, storm and water

·   Assisted the engineer in designing grading plans and profile sheets

·   Utilized 2d and 3d tools to depict contours layout sheets.

·   Utilized traffic signals and signage to design traffic control plans

 

ZARINKELK ENGINEERING                                                                                               2007-2007

Senior Level Civil Designer

 

Key Projects:

·   Southeast Corridor-Metro Light Rail

 

Responsibilities:

·   Operated ArcMap/GIS geometry to develop street modification plan & profiles sheets

·   Utilized MicroStation V8 to develop Traffic Control Layouts

·   Mentored/Facilitated drafting responsibities to Mid/Entry level drafters

·   Checked and reviewed plans sets for accuracy and comprehension

·   Created alignment sheets for various utilities such as gas pipeline, storm and water

·   Utilized AutoCAD 2009 to manipulate existing DWG files

·   Utilized AutoCAD  3D to modify/ create property layouts

·   Assisted the engineer in designing and preparing, utility plans, site plans, grading plans and traffic control plans

·   Utilized traffic signals and signage to design traffic control plans

 

 

DASHIELL CORPORATION                                                                                                  2006-2007

Electrical Designer

 

Key Projects:

·   Pacific Gas & Electricity Company (P G & E)

 

Responsibilities:

·   Developed (BOM) Bills and Materials for proposed 330kv transmission substations for the state of California

·   Utilized AutoCAD to generate schematics, relays, cable trays and SCADA and wiring diagrams

·   Created details sheets and plan sheets of the proposed substation

·   Renovated existing substation control house and site layouts

·   Imported TIFF and JPEG images to MicroStation V8 to develop site layouts sheets.

·   Utilized Meridian database to store all DGN and DWG files

·  Reviewed fabrication and vendor drawings for its proposed application to the project

 

 

 

 

CENTERPOINT ENERGY-1301 TRAVIS TOWER                                                                                2005-2006                                                                                                                                                                         

Gas Pipeline Designer (contractor)

 

Key Projects:

·   Harbor Walk

·   Remington Place

·   Tiki Island

 

Responsibilities:

·   Assisted the engineer in designing grading plans

·   Assisted the design engineer in checking the integrity of the pipeline drawings

·   Utilized ArcMap/GIS 9.1 database  to extract aerial imagery in developing property layouts

·   Utilized ArcMap/GIS 9.1 to create 8 ½” x11 parcels maps for proposed areas

·   Utilized MicroStation V8 to create parcel maps of gas pipelines for residential subdivisions.

·   Developed BOM’S for pipeline projects

·   Created alignment sheets for various utilities such as gas pipeline, storm and water

·   Utilized various pipeline fitting attributes like elbows, tees, crosses and back flow preventers

·   Provided cost estimate analysis for the proposal of gas pipelines in residential subdivisions

·   Performed field data collection to aid in the designing of gas pipelines

·   Performed and assisted design engineer to create progress reports of the proposed pipeline areas

·   Utilized ArcMap/Gis 9.1 to identify potential conflicts of proposed gas pipelines

·   Interpreted P&IDS to aid in the development of pipeline layouts.

 

 

ESPA CORP                                                                                                                       2000-2005

Lead Civil Designer&Planner

 

Key Projects:

·   Alief Parking Lot Bus Facility

·   University of Houston Downtown New Classroom Building

·   University of Houston University Park Campus Parking Lots

·   City of Houston Parks of Standards

·   Aldine Independent School District

·   George R. Brown Convention Center Expansion

 

Responsibilities:

·   Designed & created Drainage Area Map Plans

·   Designed demolition plans of a site

·   Assisted the engineer and checking the drawings for accuracy and comprehension

·   Designed structural pavement layout sheets and foundations utilizing AutoCAD 2002 and COH design standards

·   Utilized MicroStationV8 & AutoCAD to design site layouts, grading and proposed utility drainage plan and profile sheets

·   Performed routine redlines of site layouts, grading and proposed utility drainage plan and profile sheets

·   Designed & created Storm Water Prevention Plans

·   Performed data measurements and collections to aid in the development of various projects

·   Utilized AutoCAD 2002 to create horizontal control layouts

·   Conversed with local municipalities and clients to complete  plats for recordation

·   Incorporated Excel tables into DWG files to illustrate DAMP acreages and  x,y coordinates

of horizontal control plans

·   Utilized traffic signals and signage to design traffic control plans

 

 

 

 

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

Engineering Assistant

CenterPoint Energy

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Years of relevant work experience:

10+ to 15 Years

Date of Availability:

Within 2 weeks

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

Citizenship:

None

 

 

Target Job:

Target Job Title:

Engineering Assistant

Desired Status:

Full-Time

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-TX-Houston

Relocate:

Yes

Willingness to travel:

Up to 25% travel